1 General Part
This questionnaire prepared by the MOME consortium is designed to collect information about IP monitoring and measurement activities in Europe. Part 1 contains the general part of this survey.
1.1 Information on the Interviewee
1.1.0: Project Title, operator/NREN name
Provide the name / acronym of the interviewed project or the name of the interewied company. For reference, use the same name also for the other parts of the questionnaire.
Please write your answer here:

1.1.1: Category
Select the category of the interview partner. In case more than one applies, please fill separate questionnaires for each.
Please tick only one of the following:
Project
Operator
Research/Educational Network

1.1.2: Interviewed Person Contact Details
Provide name/company, address and email
Please write your answer in the box below:

1.1.3: (Project) Manager Contact Details
Provide name/company, address and email
Please write your answer in the box below:

1.1.4: Measurement Responsible Person Contact Details
Provide name/company, address and email
Please write your answer in the box below:

1.1.5: Other Information on the Interviewee
Include any other information on the interview partner, e.g. relation to MOME, why contacted, how contact was established, etc.
Please write your answer in the box below:

1.2 Monitoring/Measurement approach
1.2.1: Measurement Objectives
Indicate for which objectives measurements are used for.
Please tick any that apply
traffic control
traffic engineering
architecture evaluation
QoS measurements
intrusion detection
accounting
SLA/SLS monitoring
failure management
Other:

1.2.2: Measurement Methods/Algorithms
Indicate, which methodologies/algorithms are used. Add a comment to give a detailed hint on the methodology (e.g. SNMP, link monitoring, active packet probing,...)
Please tick any that apply and provide a comment
active measurement
passive measurement
online result analyses
offline result analyses

1.2.3: Metrics to be measured
Indicate which metrics are measured. If a standard metric is used, please specify (e.g. IPPM, ITU-T).
Please tick any that apply and provide a comment
connectivity
one-way delay
round-trip delay
delay variation
packet loss
packet loss patterns
packet re-ordering
throughput
used bandwidth
available bandwidth
bulk data transfer capacity
link capacity

1.3 Measurement Scenarios
1.3.1: Timeframe
Please tick any that apply
short-term measurements (minutes/hours)
mid-term (days/weeks)
long-term (month and more)

1.3.2: Measurement Results
Please tick any that apply
raw data
aggregated data
analysed data

[Answer this question if you answered 'analysed data' to question '1.3.2']
1.3.2.1: Which kind of Analyses?
Provide information on the analyses, like outlier detection, packet sampling, on-line/off-line analyses, etc.
Please write your answer in the box below:

1.3.3: Derived Results
Please tick any that apply
traffic statistics
flow statistics
alarms/notifications
graphical representation of characteristics
Other:

1.4 Used Measurement Tools
Which tools are used for measurements, ranked in terms of usage from 1 to 5. Either mention well-known tools or provide answers to the questions in the tools part.
1.4.1: Used Well-known Tools
Enter tools here, which are not developed in the project/company. The decision whether the tool is well-known or not is up to the interviewing person. Also depend on how much information about the tool can be found on the web.
Please write your answer(s) here:
Tool 1::
Tool 2::
Tool 3::
Tool 4::
Tool 5::

1.4.2: New/Own Developed Tools
Enter tools here, which do not fit into question 1.4.1 (e.g. if the tool is a development for this project/company). For these tools also fill in the tools part of the questionnaire.
Please write your answer(s) here:
Tool 1::
Tool 2::
Tool 3::
Tool 4::
Tool 5::

1.5 Standards + Standardisation plans
1.5.1: Used standards
Of which standardisation organisations (specify area/group, if applicable)
Please tick any that apply and provide a comment
IETF:
ITU:
ETSI:
DMTF:
3GPP:

1.5.2: Submit new standards
To which standardisation organisations?
Please tick any that apply
IETF
ITU
ETSI
DMTF
3GPP
Other:

1.5.2.1: Please specify what is intended to be standardised
Please write your answer in the box below:

1.5.3: Expecting new standards
Shortly describe the topic(s), in which standards are missing.
Please write your answer in the box below:

1.5.4: Awaiting draft standards to be finished
Provide information on the standards that are awaited, but still drafts currently.
Please write your answer in the box below:

1.6 Expectations from MOME
1.6.1: Expected Services
Please tick any that apply
pool measurement data
support standardisation activities
measurement tool knowledge publication
MOME-related workshops for know-how exchange
Other:

1.6.2: Provided Supply
This is not legally binding! Just mention the potential.
Please tick any that apply
monitoring/measurement data
measurement tool description
contributions to workshops/conferences
Other:

1.6.3: Co-operation potential with MOME:
Please tick any that apply
co-operation exists
co-operation planned
interested in co-operation
not interested in co-operation
Other:

1.7 Final Remarks
1.7: Final Remarks
Space for any other comments. You can also refer to above questions. If doing so, simply provide the corresponding question number.
Please write your answer in the box below:

Submit your survey!
Thank you for completing this survey. Please fax your completed survey to by 2005-12-31.